Finished the first sleeve on my summer cardi. Started the second, ten rows into it I realized I hadn't switched back to the larger needles after knitting the ribbing on sleeve #1. it was amazing how much of difference one needle size made! So a frogging I went. Took as long to rip as it did to knit..how sad is that? Rare is the project that doesn't involve a little frogging.
On the plus side by the time I finish the heat wave should have passed and I might be able wear the finished project.
No comments:
Post a Comment